Short Review
Style | APA |
Number of words | 1090 |
Number of sources | 0 |
Spacing | Double |
PowerPoint slides | 0 |
Part 1:
Read Chapter. 11 Managing Project Teams and Reflect on the assigned readings for the week. Identify what you thought was the most important concept(s), method(s), the term(s), and/or any other thing that you felt was worthy of your understanding.
Also, provide a graduate-level response to each of the following questions:
Why should a project manager emphasize group rewards over individual rewards?
Your post must be substantive and demonstrate insight gained from the course material(Text Book), so make sure to use a textbook.
Part 1 should be at least 500+ words and in APA format (including Times New Roman with font size 12 and double spaced).
Part 2:
Assume that you have the following decision-making options: (1) make the decision on your own with available information, (2) consult others before making a decision, and (3) call a meeting and reach a consensus, seeking to arrive at a final decision everyone can agree on. Which approach would you use to make each of the following decisions and why?
You are the project leader for Casino Night on campus, a charitable event organized by your group to raise money for the homeless. The event was a big success, garnering a net profit of $3,500. Before the event your team researched nearby organizations that support the homeless and to whom the money could be given. You narrowed the choices to the “Chunk of Coal House” and “St. Mary’s Soup Kitchen.” Eventually your group decided that the funds be given to Chunk of Coal. You are about to write a check to its director when you read in the local newspaper that the Chunk of Coal House has terminated operations. What should you do with the money?
You are a golf course designer hired by Trysting Tree Golf Club to renovate their golf course. You have worked closely with the board of directors of the club to develop a new layout that is both challenging and aesthetically pleasing. Everyone is excited about the changes. The project is nearly 75 percent complete when you encounter problems on the 13th hole. The 13th hole at Trysting Tree is a 125-yard par three in which golfers have to hit their tee shots over a lake to a modulated green. During the construction of the new tee box, workers discovered that an underground spring runs beneath the box to the lake. You inspected the site and agreed with the construction supervisor that this could create serious problems, especially during the rainy winter months. After surveying the area, you believe the only viable option would be to extend the hole to 170 yards and create elevated tees on the adjacent hillside.
You are the leader of a new product development project. Your team has worked hard on developing a third-generation product that incorporates new technology and meets customer demands. The project is roughly 50 percent complete. You have just received a report from the marketing department detailing a similar product that is about to be released by a competitor. The product appears to utilize radical new design principles that expand the functionality of the product. This poses a serious threat to the success of your project. Top management is considering canceling your project and starting over again. They want you to make a recommendation.
The textbook zip file is attached
Note: Make sure to cite the references in the content as well as the reference section, text book needs to be referred for both parts.