Short review
Style | APA |
Number of words | 1167 |
Number of sources | 0 |
Spacing | Double |
PowerPoint slides | 0 |
Part 1:
Read Chapter. 13 Progress and Performance Measurement and Evaluation and Reflect on the assigned readings for the week. Identify what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding.
Also, provide a graduate-level response to each of the following questions:
- Why is it important for project managers to resist changes to the project baseline? Under what conditions would a project manager make changes to a baseline? When would a project manager not allow changes to a baseline.
Your post must be substantive and demonstrate insight gained from the course material(Text Book), so make sure to use textbook.
Part 1 should be at least 500+ words and in APA format (including Times New Roman with font size 12 and double spaced).
Part 2:
Read the Case “Shoreline Stadium Status Report Case” at the end of chapter 13 and response to the following questions:
You are an assistant to Percival Young, president of G&L Construction. He has asked you to prepare a brief report on the status of the Shoreline Stadium project.
(Rest of case not shown due to length.)
Textbook zip file is attached
Note: Make sure to cite the references in the content as well as the reference section, text book needs to be referred for both parts.