Your Topic: Deliverable 1 – Creating Data Sets
Assignment Details: Competency
Describe the process of creating data sets.
Student Success Criteria
View the grading rubric for this deliverable by selecting the “This item is graded with a rubric” link, which is located in the Details & Information pane.
Scenario
You are the facility manager for EnVision, a high-tech vehicle maker located in Atlanta. This new company designs, manufactures, and sells electric vehicles and charging units. EnVision’s unique designs, technical prowess, and limited competition has placed them in the enviable position of having a high demand for their line of products. This demand has generated over a billion dollars in pre-sale orders, and facility expansion will be required to meet customer needs. Due to space limitations within the existing plant and surrounding property, the firm’s CEO, Mark Hammel, has asked you to assist him in selecting a new site that will accommodate a new state-of-the-art facility.
The CEO has stated that retention of current employees is paramount which limits your selection to the local area. He also stated that it would be highly desirable to use sustainable energy in the plant’s operations. Resources in the form of additional personnel, raw materials, utilities, and shipping conveyances also need consideration.
Instructions
In a written memo to Mark Hammel, address the following issues in regards to your site research.
Appraise valid sources of data in regards to sustainable energy (if any), skilled labor, raw materials, utilities, and shipping conveyances in the Atlanta area. You must cite the source(s) of the data you use.
Discuss the relationships between sustainable energy, skilled labor, raw materials, utilities, and shipping conveyances for a manufacturing facility in the Atlanta area.
Evaluate potential gaps or issues with the identified datasets. Share how you plan to go about closing these gaps, including identification of further sources of data or research that might be necessary.
Using Excel, organize your sources of data into datasets. Include as part of your submission.
Data Files
For this deliverable, please reference the following data files as necessary:
Hi Hellen you did this paper before but it was graded F, so can you do it over I already paid for it again,
EnVision Survey.xlsx
Atlanta vs US Utilities.xlsx
2016 Manufacturing.csv
2016 Power generation and Supply.csv
2016 Alumina and Aluminum Production.csv
2016 Industrial Machinery Manufacturing.csv
2016 Rail transportation.csv
2016 Specialized Freight Trucking.csv
2016 Employment Services.csv
Image preview for”describe the process of creating data sets. “
APA
1235 words