TEMPORARY- WORKS ENGINEERING: FORMWORK; PRECAST CONCRETE
Dear Freelancer, This is almost the same as the one you sent me yesterday. There is no discussion about why the three areas nominated for construction require temporary works engineering For part a, there should be three nominated areas and they are already showing as design of temporary form-work systems(both horizontal and vertical),the design of scaffolding and false work and the design of temporary fixing and bracing for vertical precast concrete elements respectively. But the important thing is to discuss the reason of why the three areas nominated for construction require temporary-works engineering. There is lack of this And when nominated one area the following should go cover of the reason of why it requires the temporary-work engineering , but not only talk about the nominated area itself . it’s important to mention the temporary-work engineering. That is the key
Answer Preview